Question: The costs to manufacture a part using methods A and B are estimated by CA= 10 + 0.8 P and CB = 60 + 0.8
The costs to manufacture a part using methods A and B are estimated by CA= 10 + 0.8 P and CB = 60 + 0.8 P − 0.005 P2 respectively, where the cost C is in dollars and P is the number of parts. Estimate the breakeven point.
Step by Step Solution
3.33 Rating (156 Votes )
There are 3 Steps involved in it
Cost to manufacture using method A C A 10 08P Cost to manufactu... View full answer