The manufacturer of Boston and Vermont asphalt shingles constructed control charts and analyzed several quality characteristics. One
Question:
For the 25 days of production for Boston shingles,
a. Construct a control chart for the range.
b. Construct a control chart for the mean.
c. Is the process in control?
d. Repeat (a) through (c), using the 19 production days for Vermont shingles.