Two industrial plants represent balanced three-phase loads. The plants receive their power from a balanced three-phase source

Question:

Two industrial plants represent balanced three-phase loads. The plants receive their power from a balanced three-phase source with a line voltage of 4.6 kV rms. Plant 1 is rated at 300 kVA, 0.8 pf lagging and plant 2 is rated at 350 kVA, 0.84 pf lagging. Determine the power line current.