Two processes in a manufacturing line are performed manually: operation A and operation B.A random sample of

Question:

Two processes in a manufacturing line are performed manually: operation A and operation B.A random sample of 50 different assemblies using operation A shows that the sample average time per assembly is 8.05 minutes, with a population standard deviation of 1.36 minutes. A random sample of 38 different assemblies using operation B shows that the sample average time per assembly is 7.26 minutes, with a population standard deviation of 1.06 minutes. For α = .10,is there enough evidence in these samples to declare that operation A takes significantly longer to perform than operation B?

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question
Question Posted: