A control chart for the number of nonconforming piston rings is maintained on a forging process with

Question:

A control chart for the number of nonconforming piston rings is maintained on a forging process with np = 16.0. A sample of size 100 is taken each day and analyzed.
A control chart for the number of nonconforming piston rings

(a) What is the probability that a shift in the process average to np = 20.0 will be detected on the first day following the shift? What is the probability that the shift will be detected by at least the end of the third day?
(b) Find the smallest sample size that will give a positive lower control limit.

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question
Question Posted: