A flexible manufacturing system is used to produce four parts. The FMS consists of one load/unload station

Question:

A flexible manufacturing system is used to produce four parts. The FMS consists of one load/unload station and two automated processing stations (processes X and Y). The number of servers for each station type is to be determined. The FMS also includes an automated conveyor system with individual carts to transport parts between servers. The carts move the parts from one server to the next, drop them off, and proceed to the next delivery task. Average time required per transfer is 3.5 minutes. The following table summarizes the FMS:
A flexible manufacturing system is used to produce four parts.

All parts follow the same routing, which is 1 ( 2 ( 3 ( 1. The product mix and processing times at each station are presented in the table below:

A flexible manufacturing system is used to produce four parts.

Required production is 10 parts per hour, distributed according to the product mix indicated. Use the bottleneck model to determine
(a) The minimum number of servers at each station and the minimum number of carts in the transport system that are required to satisfy production demand and
(b) The utilization of each station for the answers above.

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Applied Statistics And Probability For Engineers

ISBN: 192504

7th Edition

Authors: Montgomery, Douglas C., Runger, George C.

Question Posted: