Question: A subdivision in Corvallis, Oregon, is shown in Figure P6.21. Rational method design is performed using the 10 - yr return period IDF curve of
A subdivision in Corvallis, Oregon, is shown in Figure P6.21. Rational method design is performed using the 10 - yr return period IDF curve of the Oregon Department of Transportation (1990) for Zone 8, which may be approximated as follows:
.png)
With i in in./hr and tr in minutes. The standard error of estimate is 0.0079 in./hr.
29.8438 84 432.8875 i= 0.2081 +
Step by Step Solution
3.46 Rating (166 Votes )
There are 3 Steps involved in it
a Estimate the peak flow at the outlet from the curved and portion of Sitka Place roughly where a line on the asphalt payment would connect house 3 and 8 as shown by the arrow on the figure Follow the... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
843-G-E-M (180).docx
120 KBs Word File
