Question: A surge tank system is to be installed as part of a pilot plant facility. The initial proposal calls for the configuration shown in figure.

A surge tank system is to be installed as part of a pilot plant facility. The initial proposal calls for the configuration shown in figure. 4.3. Each tank is 5 ft high and 3 ft in diameter. The design flow rate is q1 = 100gal/mm. It has been suggested that an improved design will result if the two tank system is replaced by a single tank that is 4 ft in diameter and has the same total volume (i.e., V= V1 + V2).

(a) Which surge system (original or modified) can handle larger step disturbances iii qi? Justify your answer.

(b) Which system provides the best damping of step disturbances in q1? (Justify your answer). In your analysis you may assume that:

(i) The valves on the exit lines act as linear resistances.

(ii) The valves arc adjusted so that each tank is half full at the nominal design condition of qt 100gal/min.

Step by Step Solution

3.37 Rating (166 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

a For the original system Using deviation variables and taking Laplace transforms For s... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

38-E-C-E-P-C (79).docx

120 KBs Word File

Students Have Also Explored These Related Chemical Engineering Questions!