Refer to the Watermate Data Set above. Requirements 1. Compute the standard predetermined variable manufacturing overhead rate,
Question:
Requirements
1. Compute the standard predetermined variable manufacturing overhead rate, the standard predetermined fixed manufacturing overhead rate, and the total standard predetermined overhead rate.
2. Compute the standard cost of each of the following inputs: direct materials, direct labour, variable manufacturing overhead, and fixed manufacturing overhead.
3. Determine the standard cost of one ceramic bottle.