Question: Repeat Example 9-3 using HEC-RAS but use a 100-yr storm at this location. Recalculate Q for a 100-yr .storm using the same C, A, and
Repeat Example 9-3 using HEC-RAS but use a 100-yr storm at this location. Recalculate Q for a 100-yr .storm using the same C, A, and 7c information provided in Example 9-2 . Evaluate the behavior of the 7 x 3 box culvert and then examine the behavior of a 6 x 3 box culvert at this location. Document the diflerences in culvert performance, including weir flow depths for comparative purposes. Determine the minimum span (width) of box culvert needed to prevent overtopping of the roadway if the box culvert rise (height) allowed is increased to 4 ft.
Step by Step Solution
3.29 Rating (167 Votes )
There are 3 Steps involved in it
i b T c d e 1254 16218 075 8226 C 018 A 160 ac Q 018 160 8226 2369 cfs The 6 x 3 and 7 x 3 box culve... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
843-G-E-M (244).docx
120 KBs Word File
