Have you ever worked on a project with an elevator? Was a down payment made before delivery?

Question:

Have you ever worked on a project with an elevator? Was a down payment made before delivery? How long was the lead time? Was the cab finished per specification, or were upgrades made? Who built the cab upgrades – the elevator subcontractor, or the building finishes subcontractors?

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Construction Cost Estimating

ISBN: 9780367902681

1st Edition

Authors: John E. Schaufelberger, Len Holm

Question Posted: