Engineers at a computer production plant tested two methods for accuracy in drilling holes into a PC

Question:

Engineers at a computer production plant tested two methods for accuracy in drilling holes into a PC board. They tested how fast they could set the drilling machine by running 10 boards at each of two different speeds. To assess the results, they measured the distance (in inches) from the center of a target on the board to the center of the hole. The data and summary statistics are shown in the table:

image text in transcribed
Write a report summarizing the findings of the experiment. Include appropriate visual and verbal displays of the distributions, and make a recommendation to the engineers if they are most interested in the accuracy of the method.
Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Stats Data And Models

ISBN: 662

4th Edition

Authors: Richard D. De Veaux, Paul D. Velleman, David E. Bock

Question Posted: