14. 11.34 The delivered-equipment cost for a fully equipped CNC machining system is $4.6 million. The direct
Question:
14. 11.34 The delivered-equipment cost for a fully equipped CNC machining system is $4.6 million. The direct cost factor is 1.52 and the indirect cost factor is 0.31. Estimate the total plant cost if the indirect cost factor applies to
(a) the delivered-equipment cost only, and
(b) the total direct cost.