26. A small plant has been constructed and the costs are known. A new plant is to be estimated with the use of the exponential (power sizing) costing model. Major equipment, costs, and factors are as shown in Table P3-26.
(Note MW = 106 Watts.)
If ancillary equipment will cost an additional
$200,000, find the cost for the proposed plant. (3.4)