3-27. Extended Learning Exercise. You have been asked to prepare a quick estimate of the construction cost

Question:

3-27. Extended Learning Exercise. You have been asked to prepare a quick estimate of the construction cost for a coal-fired electricity generating plant and facilities. A work breakdown structure (levels one through three) is shown is Table P3-27. You have the following information available: • A coal-fired generating plant twice the size of the one you are estimating was built in 1996. The 1996 boiler (1.2) and boiler support system (1.3) cost $110 million. The cost index for boilers was 110 in 1996, it is 492 in 2019. The cost capacity factor for similar boilers and support systems is 0.9. The 600-acre site is on property you already own, but improvements (1.1.1) and roads (1.1.2) will cost $2,000 per acre, and railroads (1.1.3) will cost $3,000,000. Project integration (1.9) is projected to cost 3% of all other construction costs. • The security systems (1.5.4) are expected to cost $1,500 per acre, according to recent (2019) construction of similar plants. All other support facilities and equipment (1.5) elements are to be built by Viscount Engineering. Viscount Engineering has built the support facilities and equipment elements for two similar generating plants. Their experience is expected to reduce labor requirements substantially; a 90% learning curve can be assumed. Viscount built the support facilities and equipment on their first job in 95,000 hours. For this project, Viscount’s labor will be billed to you at $60 per hour. Viscount estimates that materials for the construction of the support facilities and equipment elements (except 1.5.4) will cost you $15,000,000. • The coal storage facility (1.4) for the coal-fired generating plant built in 1996 cost $5 million. Although your plant is smaller, you require the same size coal storage facility as the 1996 plant. You assume you can apply the cost index for similar boilers to the coal storage facility. What is your estimated 2019 cost for building the coal-fired generating facility? Summarize your calculations in a cost estimating worksheet, and state the assumptions you make.

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Engineering Economy

ISBN: 9780134870069

17th Edition

Authors: William Sullivan, Elin Wicks, C Koelling

Question Posted: