5. 11.25 Instead of using a cost-capacity equation for relating project size and construction cost, the Department
Question:
5. 11.25 Instead of using a cost-capacity equation for relating project size and construction cost, the Department of Defense uses a size adjustment factor (SAF) that is based on the size relationship ratio (SRR). If an SRR of 2.0 has an SAF of 1.25, what must be the exponent in the costcapacity relation for C2 to be 1.25C1 when Q2/Q1 = 2.0?
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Related Book For
Basics Of Engineering Economy
ISBN: 9781259683312
3rd Edition
Authors: Leland T. Blank, Anthony Tarquin
Question Posted: