The B/C ratio for a flood control project along the Swanee River was calculated to be 1.3.

Question:

The B/C ratio for a flood control project along the Swanee River was calculated to be 1.3. If the benefits were $500,000 per year and the maintenance costs were $200,000 per year, determine the initial cost of the project at an interest rate of 7% per year and a 50-year life.

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Engineering Economy

ISBN: 978-0073523439

8th edition

Authors: Leland T. Blank, Anthony Tarquin

Question Posted: