A BCP should be tested by: a.Testing small parts of the plan at a time, then slowly
Question:
A BCP should be tested by:
a.Testing small parts of the plan at a time, then slowly working up to a full-scale test.
b.Testing each individual plan separately, but all in the same week.
c.Testing each division for a full day as often as possible.
d.Doing a full-on disaster simulation of the entire site.
Fantastic news! We've Found the answer you've been seeking!