Question: Given the following product tree, determine the low-level codes and the gross and net quantities for each part. There is a requirement for 100 As
Given the following product tree, determine the low-level codes and the gross and net quantities for each part. There is a requirement for 100 As in week 4 and 50 Bs in week 5. There is a scheduled receipt of 100 Cs in week 2. Quantities required of each are also shown.


E(1) C(2) A F(1) E(2) D(1) E(1) C(1) E(1) F(1) B E(1) C(1) F(1) Low-Level Code Part A Lead Time: 1 week Lot Size: lot-for-lot Part B Lead Time: 1 week Lot Size: lot-for-lot Part C Lead Time: 1 week Lot Size: lot-for-lot Part D Lead Time: 1 week Lot Size: lot-for-lot Part E Lead Time: 1 week Lot Size: 500 Part F Lead Time: 1 week Lot Size: lot-for-lot Week Gross Requirements Scheduled Receipts Projected Available Net Requirements Planned Order Receipt Planned Order Release Gross Requirements Scheduled Receipts Projected Available Net Requirements Planned Order Receipt Planned Order Release Gross Requirements Scheduled Receipts Projected Available Net Requirements Planned Order Receipt Planned Order Release Gross Requirements Scheduled Receipts Projected Available Net Requirements Planned Order Receipt Planned Order Release Gross Requirements Scheduled Receipts Projected Available Net Requirements Planned Order Receipt Planned Order Release Gross Requirements Scheduled Receipts Projected Available Net Requirements Planned Order Receipt Planned Order Release 1 2 3 4 5
Step by Step Solution
3.39 Rating (146 Votes )
There are 3 Steps involved in it
Low level code 0 Part A Lead time 1 week Lotfor lot Part B Lead time 1 week Lotfor lot Week Gross re... View full answer
Get step-by-step solutions from verified subject matter experts