System capacity is based on: a) The bottleneck. b) Throughput time. c) Time of the fastest station.

Question:

System capacity is based on:
a) The bottleneck.
b) Throughput time.
c) Time of the fastest station.
d) Throughput time plus waiting time.
e) None of the above.