Based on the data in Figure 14.13, complete a net material requirements schedule using lot-for-lot for: a)
Question:
Based on the data in Figure 14.13, complete a net material requirements schedule using lot-for-lot for:
a) All items (7 schedules in all), assuming the requirement for A is 1.
b) All 7 items, assuming the requirement for all items is 1, except B, C, and F, which require 2 each.
Data from Figure 14.13