Question: Using AOA, diagram the network described below for Roni Zuckermans construction project. Calculate its critical path. How long is the minimum duration of this network?
Using AOA, diagram the network described below for Roni Zuckermans construction project. Calculate its critical path. How long is the minimum duration of this network?

Time (weeks) Time Nodes (weeks) Activity Nodes 10 Activity J 3-4 1-2 N K 1-3 4-5 3-5 5 2-4 2-4 3 2-3
Step by Step Solution
3.35 Rating (155 Votes )
There are 3 Steps involved in it
The paths through this network a... View full answer