Camyo Manufacturing produces four parts that require the use of a lathe and a drill press. The
Question:
Camyo Manufacturing produces four parts that require the use of a lathe and a drill press. The two machines operate 10 hours a day. The following table provides the time in minutes required by each part:
Production time in min Part Lathe Drill press 1 5 3 2 6 2 3 4 6 4 7 4 It is desired to balance the two machines by limiting the difference between their total operation times to at most 30 minutes. The market demand for each part is at least 10 units. Additionally, the number of units of part 1 may not exceed that of part 2.
Formulate the problem as a GP model.
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Related Book For
Question Posted: