Refer to Figure 18.37. Given: L 1 = 4 m, L 2 = 6 m, l 1
Question:
Refer to Figure 18.37. Given: L1 = 4 m, L2 = 6 m, l1 = 2 m; for the sand, γ = 17.0 kN/m3, γsat = 19.0 kN/m3, ϕ' = 34°; and for the clay, γsat = 20.0 kN/m3, c = 40 kN/m2, ϕ = 0.
Determine the theoretical depth of embedment (D) and the anchor force (F).
Figure 18.37
Transcribed Image Text:
A L, o F Water level o\C Sand, y, o' Sand Ysat- 4' L2 Dredge line D Clay Clay Ysat D $ = 0 F B
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 50% (8 reviews)
To determine the theoretical depth of embedment D and the anchor force F the following steps can ...View the full answer
Answered By
BillClinton Muguai
I have been a tutor for the past 5 years. I have experience working with students in a variety of subject areas, including computer science, math, science, English, and history. I have also worked with students of all ages, from elementary school to college. In addition to my tutoring experience, I have a degree in education from a top university. This has given me a strong foundation in child development and learning theories, which I use to inform my tutoring practices.
I am patient and adaptable, and I work to create a positive and supportive learning environment for my students. I believe that all students have the ability to succeed, and it is my job to help them find and develop their strengths. I am confident in my ability to tutor students and help them achieve their academic goals.
0.00
0 Reviews
10+ Question Solved
Related Book For
Principles Of Foundation Engineering
ISBN: 9781337705028
9th Edition
Authors: Braja M. Das, Nagaratnam Sivakugan
Question Posted:
Students also viewed these Engineering questions
-
Refer to Figure 18.13. Given L 1 = 1.5 m, L 2 = 3 m; for the sand, ' = 33, = 16.5 kN/m 3 , sat = 19.0 kN/m 3 ; and, for the clay, c = 50 kN/m 2 , = 0, and sat = 20 kN/m 3 . Determine the depth of...
-
Refer to Figure 18.23. Given L 1 = 3 m, L 2 = 6 m, l 1 = 1.5 m, = 16.5 kN/m 3 , sat = 19.0 kN/m 3 , and ' = 35. a. Find the required depth of the sheet pile, increasing the theoretical estimate by...
-
Redo Problem 18.9 using the Hagerty and Nofal (1992) charts from Section 18.12. Problem 18.9 Refer to Figure 18.23. Given L 1 = 3 m, L 2 = 6 m, l 1 = 1.5 m, = 16.5 kN/m 3 , sat = 19.0 kN/m 3 , and...
-
Solve for y' y' = y = 71-x 3
-
Born between 1980 and 1990, Generation Next is engaged with technology, and the vast majority is dependent upon it. Suppose that in a survey of 500 female and 500 male students in Generation Next,...
-
Explain the reasons that an individual might choose to purchase scheduled coverage under an inland marine floater
-
Carson Company has four separate operating segments: Apples $123,000 31,000 LO3 Oranges $81,000 26,000 Pears $95,000 13,000 Peaches $77,000 18,000 Sales to outsiders Intersegment transfers What...
-
The data listed below are taken from a balance sheet of Trident Corporation. Some amounts, indicated by question marks, have been intentionally omitted. Required: 1. Determine the missing amounts. 2....
-
A firm is evaluating new widget machines offered by four companies. The selections are mutually exclusive and only one will be bought. Use incremental rate of return analysis to decide which...
-
1. Discuss e-commerce risks for revenue and expense cycles and the internal controls required to mitigate these risks? 2. Discuss how audit command language (ACL) can be applied to test these...
-
Using Eq. (18.97) with m = 0.5, determine the ultimate holding capacity of the anchor in sand where H = 1.2 m, h = 0.75 m, B = 0.9 m, and ' = 32. Eq. (18.97) Pult = Myg (yh?)BF,
-
Assuming that the spacing of the anchors S' is very large in Problem 18.16, determine the ultimate holding capacity using Eq. (18.98). What would be the anchor displacement when the load on the tie...
-
A current surplus is due to a price floor. If the price floor is removed, a. price would increase, quantity demanded would increase, and quantity supplied would increase. b. price would increase,...
-
1. (5 pts) Given y[n]= 2y[n-1] and y[0]=2, Write MATLAB code to calculate and plot y for 0
-
F ( t ) = t 4 + 1 8 t 2 + 8 1 2 , g ( t ) = ( t + 3 ) / 3 ; find ( f o g ) ( 9 )
-
How did they calculate allocated cost FLIGHT A FLIGHT 350 615 FLIGHT 3 1 Go GALS 20 G EXISTING SCHEME, DETERMINE THE OVE OR FLIGHTS A, B, AND C. 2 ED AT 7.00 PER K1.00 OF PILOT SALAF TOTAL NON-SALARY...
-
High Tech ManufacturingInc., incurred total indirect manufacturing labor costs of $540,000. The company is labor-intensive. Total labor hours during the period were 5,000. Using qualitativeanalysis,...
-
Start with AS/AD and IS/MP in full employment equilibrium. Assume the is a massive positive aggregate demand shock. How would this affect AS/AD and IS/MP and prices and output relative to the full...
-
Fill in the blank with an appropriate word, phrase, or symbol(s). In a linear programming problem the restrictions that are represented by linear inequalities are called the _______ .
-
Suppose the spot and six-month forward rates on the Norwegian krone are Kr 5.78 and Kr 5.86, respectively. The annual risk-free rate in the United States is 3.8 percent, and the annual risk-free rate...
-
Suppose that z = xy, where x and y are independent and normally distributed random variables. The mean and variance of x are x = 10 and 2 x = 2. The mean and variance of y are y = 15 and 2 y = 3....
-
Use a random number generator to produce 1000 uniformly distributed numbers with a mean of 10, a minimum of 2, and a maximum of 18. Obtain the mean and the histogram of these numbers, and discuss...
-
Use a random number generator to produce 1000 normally distributed numbers with a mean of 20 and a variance of 4. Obtain the mean, variance, and histogram of these numbers, and discuss whether they...
-
An underlying asset price is at 100, its annual volatility is 25% and the risk free interest rate is 5%. A European call option has a strike of 85 and a maturity of 40 days. Its BlackScholes price is...
-
Prescott Football Manufacturing had the following operating results for 2 0 1 9 : sales = $ 3 0 , 8 2 4 ; cost of goods sold = $ 2 1 , 9 7 4 ; depreciation expense = $ 3 , 6 0 3 ; interest expense =...
-
On January 1, 2018, Brooks Corporation exchanged $1,259,000 fair-value consideration for all of the outstanding voting stock of Chandler, Inc. At the acquisition date, Chandler had a book value equal...
Study smarter with the SolutionInn App