S6.37 Daily samples of 100 power drills are removed from the assembly line at Drills by Stergios
Question:
• • • S6.37 Daily samples of 100 power drills are removed from the assembly line at Drills by Stergios Fotopoulos and inspected for defects. Over the past 21 days, the following information has been gathered. Develop a 3 standard deviation (99.73% confidence)
p-chart and graph the samples. Is the process in control?
Step by Step Answer:
Related Book For
Operations Management: Sustainability And Supply Chain Management
ISBN: 9780135225899,9780135202722
13th Edition
Authors: Jay Heizer; Barry Render; Chuck Munson
Question Posted: