The following data were obtained from a study of the times required to conduct a consumer test
Question:
The following data were obtained from a study of the times required to conduct a consumer test panel study:
a. Find the all-normal schedule and cost.
b. Find the all-crash schedule and cost.
c. Find the total cost required to expedite all activities from all-normal (case
a) to all-crash (case b).
d. Find the least-cost plan for the all-crash problem (b).
Assume partial crashing.