Question
The Colfor Manufacturing facility produces many parts internally, but can also outsource certain parts to two outsourcing facilities. The group needs to determine which parts
The Colfor Manufacturing facility produces many parts internally, but can also outsource certain parts to two outsourcing facilities. The group needs to determine which parts are to be made internally and which parts are to be outsourced. The following table describes the internal resources required and the overall demand for the coming week.
This week they have 36 hours of machine time available at a rate of $45 per hour and 84 hours of labor available at a rate of $28 per hour. Due to quality control issues part 1 and part 2 must be produced in the same facility. The cost per part for outsourcing is listed in the table below.
Requirement:
Create a model to determine the optimum sourcing strategy to minimize total cost.
Resources required Machine time (minutes per part) Labor (minutes per part) Materials (cost per part) Demand Part 1 Part 2 Part 3 Part 4 Part 5 12 16 22 10 25 30 40 45 20 40 $19 $20 $17 $11 $20 202 202 219 249 169 Outsource cost per part Part 1 Part 2 Part 3 Part 4 Part 5 $54 $57 $50 Outsource 1 $44 Outsource 2 $53 $43 $53 $46
Step by Step Solution
3.27 Rating (150 Votes )
There are 3 Steps involved in it
Step: 1
Resource Scheduling The intention of this stage of analysis of a project is to suppose the resource requirements of a project Activity resources can be the labor cost of designers and further staff do...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started