1 . 1 . Project Objectives The Fluid process engineers aim to achieve the following objectives: GENERAL This design project is intended to provide the

1.1. Project Objectives
The Fluid process engineers aim to achieve the following objectives:
GENERAL
This design project is intended to provide the students with the knowledge and skills of making use of Process Fluid Flow principles to design, size, and select a suitable centrifugal pump that will be suitable to efficiently sustain the delivery of water from the reservoir situated at the Tshwane water treatment plant to any of the city of Tshwane communities.
TASK
1. Specify the size and location of all storage tanks.
2. Select tank material and specify the wall thickness of the holding tanks.
3. For the piping system, specify the material type and sizes of all pipes, and the lengths required
4. Specify the desired flow rate to be delivered. (Please also remember that for a pumped system, the pipe size is chosen with the critical velocity criteria and the desired flow rate).
5. Specify the number, types, material, and size of all valves, elbows, and fittings.
6. Develop the hydraulic analysis of all parts of the system; this includes energy losses due to friction and minor losses.
7. How many pumps do you need? What are the requirements (this is, you have to provide pump head and flow rate) of each pump?
8. Specify the characteristics of the chosen pumps, point of operation, and actual pump. print out the pages in the catalog where you got the information
9. Evaluate the NPSH available for your design, and demonstrate that your pump has an acceptable NPSH required.
10. Use the supplied Excel algorithm to compute your data. Use the findings obtained to make an informed decision.
11. Submit the results of your design in a neat and complete report, including a narrative description of the system, plant operation narrative, the sketches, a list of materials, and the analysis to show that your design meets the specifications. Include a discussion on why your design is cost-effective.Water treatment plant-Tshwane
Figure 1. Water supply line between Tshwane and Mamelodi (Note that the figure is not drawn to scale).
image text in transcribed

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Metal Air Batteries Principles Progress And Perspectives

Authors: Ram K. Gupta

1st Edition

1032282088, 978-1032282084

More Books

Students also viewed these Chemical Engineering questions

Question

Uses effective delegation to develop others.

Answered: 1 week ago