Mickley Company's plantwide predetermined overhead rate is $23.00 per direct labor-hour and its direct labor wage rate is $13.00 pe hour. The following information pertains to Job A-500: Direct materials Direct labor $ 210 $ 130 Required: 1. What is the total manufacturing cost assigned to Job A-500? 2. If Job A-500 consists of 60 units, what is the unit product cost for this job? (Round your answer to 2 decimal places.) 1. Total manufacturing cost 2. Unit product cost por unit Fickel Company has two manufacturing departments-Assembly and Testing & Packaging. The predetermined overhead rates in Assembly and Testing & Packaging are $18.00 per direct labor-hour and $14.00 per direct labor-hour, respectively. The company's direct labor wage rate is $20.00 per hour. The following information pertains to Job N-60: Direct materials Direct labor Assembly $ 370 $ 150 Testing & Packaging $ 37 $ 70 Required: 1. What is the total manufacturing cost assigned to Job N-60? (Do not round intermediate calculations.) 2. If Job N-60 consists of 10 units, what is the unit product cost for this job? (Do not round intermediate calculations. Round your answer to 2 decimal places.) 1. Total manufacturing cost 2. Unit product cost per unit Braverman Company has two manufacturing departments --Finishing and Fabrication. The predetermined overhead rates in Finishing and Fabrication are $27.00 per direct labor-hour and 110% of direct materials cost, respectively. The company's direct labor wage rate is $33.00 per hour. The following information pertains to Job 700: Direct materials Direct labor Finishing $ 495 $ 396 Fabrication $ 120 $ 260 Required: 1. What is the total manufacturing cost assigned to Job 700? 2. If Job 700 consists of 25 units, what is the unit product cost for this job? (Round your answer to 2 decimal places.) 1. Total manufacturing cost 2. Unit product cost per unit estimated that 85,000 direct labor-hours would be required for the period's estimated level of client service. The company also estimated $935,000 of fixed overhead cost for the coming period and variable overhead of $0.50 per direct labor-hour. The firm's actual overhead cost for the year was $952,900 and its actual total direct labor was 89,050 hours. Required: 1. Compute the predetermined overhead rate. 2. During the year, Tech Solutions started and completed the Xavier Company engagement. The following information was available with respect to this job: Direct materiale Direct labor cost Direct labor hours worked $ 44,100 $ 30,800 340 Compute the total job cost for the Xavier Company engagement, 5 Complete this question by entering your answers in the tabs below. Required 1 Required 2 Compute the predetermined overhead rate. (Round your answer to 2 decimal places.) Predetermined overhead rate per DLH F Required 2 > Complete this question by entering your answers in the tabs below. Required 1 Required 2 Compute the total job cost for the Xavier Company engagement. (Round your intermediate calculations to 2 decimal places.) Direct materials Direct labor Overhead applied Total manufacturing cost