Question
1 Approved Answer

1. Develop a resource breakdown structure (RBS). a. Identify resources (people, materials, equipment, etc.) required for each element in the schedule. 2. Analyze resource constraints

1. Develop a resource breakdown structure (RBS). a. Identify resources (people, materials, equipment, etc.) required for each element in the schedule. 2. Analyze resource constraints (the same resource may be required for two or more activities at the same time) based on resource availability. 3. Develop a responsibility assignment matrix (RAM) and RACI table. Develop a resource histogram for the entire project. NOTE: Choose one of the three tools to complete, not all three. 4. Identify resource overloads and propose resolutions to address them by resource leveling. 5. Estimate time required to complete each work element by considering resource constraints. 6. If required, calculate the project schedule again. Compute forward pass and backward pass to determine project duration. Determine the critical path for the project

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image
Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

The Economics Of The Energy Industries

Authors: William Peirce

2nd Edition

0275956261, 9780275956264

More Books

Students explore these related General Management questions

Question

1. Effort is important.

Answered: 3 weeks ago