Question
1. If a die yield for a 200mm^2 wafer is initially 0.80 and the process improves to 0.90, what is the defects per area for
1. If a die yield for a 200mm^2 wafer is initially 0.80 and the process improves to 0.90, what is the defects per area for both versions? Also: wafer-yield is 1.
2. A program requires 300 s to run. Of this, 85 s are spent executing FP (floating point math) instructions, 100 s are spent executing L/S (load/store) instructions, and 62 s are spent executing branch instructions. (30 pts) a) The remaining time is assumed to be INT (integer ALU) instructions. How much time would that be? b) If nothing else changes, but the time spent executing L/S instructions is reduced by 20%, how much time is saved (in percent of the original)? c) A change was made to the ALU design, causing INT instructions to run 5% faster. If all other instruction types take the same amount of time, how long (in s) does it take for the program to complete?
P.S : Include all units in calculations
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started