Question
1. Two processes, p1 and p2 arrive at time 0 and start executing using RR scheduling. The total CPU time of p1 is 70 time
1. Two processes, p1 and p2 arrive at time 0 and start executing using RR scheduling. The total CPU time of p1 is 70 time units, and p2 is 10. The quantum is Q = 10. The context switching time, which follows every Q, is S = 1.
2. Three periodic processes with the following characteristics are to be scheduled: T is the CPU Time and D is the period of the process.
For each case, determine if a feasible schedule is likely to be generated by:
- RM
- EDF
Draw the Gantt chart for the first 25-time units. For each of the 3 cases, show the schedules produced by RM and by EDF.
Case 1 T D Case 2 T D Case 3 T D p1 3 50 p1 15 50 p1 5 20 p2 70 1000 p2 5 10 p2 7 10 p3 5 40 p3 1 p3 4 100Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started