Question
1 Approved Answer
#11 10. Calculate a labor price for installing 1 12 diameter anchor bolts (Table 11.7) when a low Productivity is expected (based on Figure 11.7,
#11
10. Calculate a labor price for installing 1 12" diameter anchor bolts (Table 11.7) when a low Productivity is expected (based on Figure 11.7, Miscellaneous Concrete Work Productivity table)? (4 pts) 11. Calculate the price of crushed gravel delivered to the site per cubic meter (bank measure) based on the following data: (14 pts) The gravel source is located 18 kilometers from the site. Trucks cost $135.00 per hour including fuel and maintenance; they have 10 cubic meters (loose material) capacity and travel at an average speed of 60 km per hour. The swell factor for this material is 12%. Trucks take 5 minutes to unload at the site. The loader costs $188.00 per hour and loads materials at the pit at the rate of 42 cubic meters per hour. The truck driver's wage is $30.00 per hour, and the equipment operator's wage is $40.00 per hour. 12. Using the concrete price quotation shown on Figure 11.2, calculate the full price of 4000 psi concrete with type V cement, fiber reinforcement, and air entrainment to be delivered to the site in December (5 pts). 10. Calculate a labor price for installing 1 12" diameter anchor bolts (Table 11.7) when a low Productivity is expected (based on Figure 11.7, Miscellaneous Concrete Work Productivity table)? (4 pts) 11. Calculate the price of crushed gravel delivered to the site per cubic meter (bank measure) based on the following data: (14 pts) The gravel source is located 18 kilometers from the site. Trucks cost $135.00 per hour including fuel and maintenance; they have 10 cubic meters (loose material) capacity and travel at an average speed of 60 km per hour. The swell factor for this material is 12%. Trucks take 5 minutes to unload at the site. The loader costs $188.00 per hour and loads materials at the pit at the rate of 42 cubic meters per hour. The truck driver's wage is $30.00 per hour, and the equipment operator's wage is $40.00 per hour. 12. Using the concrete price quotation shown on Figure 11.2, calculate the full price of 4000 psi concrete with type V cement, fiber reinforcement, and air entrainment to be delivered to the site in December (5 pts) Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started