Answered step by step
Verified Expert Solution
Link Copied!
Question
1 Approved Answer

3. The U.S. auto industry produces approximately 6 million vehicles a year, each containing roughly 1.5 metric tons of fabricated metal. Consider a future wind-turbine

3. The U.S. auto industry produces approximately 6 million vehicles a year, each containing roughly 1.5 metric tons of fabricated metal. Consider a future wind-turbine industry having half of the auto industry's mass throughout of wind turbine units. Each unit has a specific weight of 75 kg/kW rated (nacelle components plus tubular tower only).

a. At a wind-turbine capacity factor of 0.3, how long would it take to replicate the 2008 U.S.-installed average electric power rating of 1035 GW?

b. Discuss (5-10 sentences) the relevant factors that would determine whether a wind machine industry of this size could be successfully operated sustainably over periods on the order of several centuries.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

Part A Calculation of Time to Reach 1035 GW at Current Capacity Factor Step 1 Calculate Total Mass of Metal in the Auto Industry The US Vehicle enterprise produces 6 million cars in line with yr with ... blur-text-image
Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Management Science The Art Of Modeling With Spreadsheets

Authors: Stephen G. Powell, Kenneth R. Baker

4th Edition

978-1118517376, 9781118800348, 1118517377, 1118800346, 978-1118582695

More Books

Students explore these related Mechanical Engineering questions