Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

A 4-story rectangular commercial building with a footprint of 6000 ft2 is being built by a developer on a previously developed 0.6 acre site on

image text in transcribedimage text in transcribedimage text in transcribed

A 4-story rectangular commercial building with a footprint of 6000 ft2 is being built by a developer on a previously developed 0.6 acre site on Long Island. There will be 45 male employees and 40 female employees working in the building for an average of 40 hours per week. 2) Answer the following about the building with regard to LEED scoring in the Water Efficiency category (please provide comparisons for yeso questions, and use data provided on the following page where appropriate): a. WEcl: Assume the use of potable water to irrigate a landscaped area equal to the minimum provision area for SSc5.1 as calculated above. Calculate the baseline water usage in gallons for the project site with mixed vegetation, average factors, and a sprinkler system. Then, propose at least two changes to the baseline case (only the provisions in the previous sentence) to allow the water usage for the project to earn points under Option 1 of this credit. Assume ET) = 23 in, and usage rate of 0.6233 galsf/in. (1.5 pts.) b. Using at least 2 references, discuss the feasibility of capturing used water on site for various uses in residential, commercial, or industrial applications (1.5 pts.) fixture Conventional Water Closet Low-Flow Water Closet Ultra Low-Flow Water Closet Composting Toilet Conventional Urinal Waterless Urinal Conventional Faucet Metered Faucet Table 1: Landscape Factors gal/use 1.60 1.10 0.80 0.00 1.00 0.00 0.50 0.25 Table 2: Irrigation Types IE Irrigation Type Sprinkler Drip 0.625 0.90 Density Factor (k) low average high 0.5 1.0 1.3 0.5 1.0 1.1 0.5 1.0 1.1 Microclimate Factor (k low average high 0.5 1.0 1.4 0.5 1.0 1.3 0.5 1.0 1.2 Vegetation Type Species Factor (k) low average high Trees 0.2 0.5 0.9 Shrubs 0.2 0.5 0.7 Groundcovers 0.2 0.5 0.7 Mixed: trees, shrubs, groundcovers 0.2 0.5 0.9 Turfgrass 0.6 0.7 0.8 Standard Fixture Uses by Occupancy Type Fixture Types FTE 0.6 0.6 1.1 1.0 1.3 1.0 0.5 0.8 1.0 1.0 1.4 1.2 Resident Student/ Visitor Uses/Day Retail Customer 3 1 0.5 0.1 0.2 0.1 5 5 0 2 3 0 0.4 0 0.1 n/a n/a 5 0.5 0.2 Water Closet female male Urinal female male Lavatory Faucet (duration 15 sec; 12 sec with autocontrol) Shower (duration 300 sec) Kitchen Sink non-residential (duration 15 sec) Kitchen Sink residential (duration 60 sec) 0.1 0 0 1 1 0 0 n/a n/a n/a n/a 4 A 4-story rectangular commercial building with a footprint of 6000 ft2 is being built by a developer on a previously developed 0.6 acre site on Long Island. There will be 45 male employees and 40 female employees working in the building for an average of 40 hours per week. 2) Answer the following about the building with regard to LEED scoring in the Water Efficiency category (please provide comparisons for yeso questions, and use data provided on the following page where appropriate): a. WEcl: Assume the use of potable water to irrigate a landscaped area equal to the minimum provision area for SSc5.1 as calculated above. Calculate the baseline water usage in gallons for the project site with mixed vegetation, average factors, and a sprinkler system. Then, propose at least two changes to the baseline case (only the provisions in the previous sentence) to allow the water usage for the project to earn points under Option 1 of this credit. Assume ET) = 23 in, and usage rate of 0.6233 galsf/in. (1.5 pts.) b. Using at least 2 references, discuss the feasibility of capturing used water on site for various uses in residential, commercial, or industrial applications (1.5 pts.) fixture Conventional Water Closet Low-Flow Water Closet Ultra Low-Flow Water Closet Composting Toilet Conventional Urinal Waterless Urinal Conventional Faucet Metered Faucet Table 1: Landscape Factors gal/use 1.60 1.10 0.80 0.00 1.00 0.00 0.50 0.25 Table 2: Irrigation Types IE Irrigation Type Sprinkler Drip 0.625 0.90 Density Factor (k) low average high 0.5 1.0 1.3 0.5 1.0 1.1 0.5 1.0 1.1 Microclimate Factor (k low average high 0.5 1.0 1.4 0.5 1.0 1.3 0.5 1.0 1.2 Vegetation Type Species Factor (k) low average high Trees 0.2 0.5 0.9 Shrubs 0.2 0.5 0.7 Groundcovers 0.2 0.5 0.7 Mixed: trees, shrubs, groundcovers 0.2 0.5 0.9 Turfgrass 0.6 0.7 0.8 Standard Fixture Uses by Occupancy Type Fixture Types FTE 0.6 0.6 1.1 1.0 1.3 1.0 0.5 0.8 1.0 1.0 1.4 1.2 Resident Student/ Visitor Uses/Day Retail Customer 3 1 0.5 0.1 0.2 0.1 5 5 0 2 3 0 0.4 0 0.1 n/a n/a 5 0.5 0.2 Water Closet female male Urinal female male Lavatory Faucet (duration 15 sec; 12 sec with autocontrol) Shower (duration 300 sec) Kitchen Sink non-residential (duration 15 sec) Kitchen Sink residential (duration 60 sec) 0.1 0 0 1 1 0 0 n/a n/a n/a n/a 4

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Dynamic Data Sharing For Public Data Integrity Auditing In The Cloud

Authors: B Gunalan

1st Edition

050911878X, 978-0509118789

More Books

Students also viewed these Accounting questions

Question

Evaluate the impact of unions on nurses and physicians.

Answered: 1 week ago

Question

Describe the impact of strikes on patient care.

Answered: 1 week ago

Question

Evaluate long-term care insurance.

Answered: 1 week ago