Answered step by step
Verified Expert Solution
Question
1 Approved Answer
A. A manufacturing company received an order to machine 800 parts. Using a CNC milling machine, the engineer in charge has the options to
A. A manufacturing company received an order to machine 800 parts. Using a CNC milling machine, the engineer in charge has the options to do machining at three (3) cutting speeds (100, 300, and 500 m/min) and using three (3) types of cutting fluids/cooling techniques (flood cooling, near dry machining/minimum quantity of lubricant (MQL), and dry machining (without cutting fluid)). After cost estimation on total tool cost and cutting fluid cost (including purchase, handling, and disposal costs), the data in Table Q2 is obtained. You know that there are three (3) pillars/major aspects of sustainability, which are economy. society, and environment. From the data in Table Q2, recommend which type of machining condition to conduct the machining process. Justify your recommendation (10 marks) Machining condition. P Q R S T U V W X Table Q2: Costing estimate for machining 800 parts Cutting speed Cooling Tool cost (m/min) technique (RM) 100 dry 1750 100 MQL 1150 100 flood 800 200 200 200 300 300 300 dry MQL flood dry MQL flood 2000 1250 900 2250 1250 1000 Cutting fluid cost (RM) 0 150 600 0 100 450 0 50 300 A. A manufacturing company received an order to machine 800 parts. Using a CNC milling machine, the engineer in charge has the options to do machining at three (3) cutting speeds (100, 300, and 500 m/min) and using three (3) types of cutting fluids/cooling techniques (flood cooling, near dry machining/minimum quantity of lubricant (MQL), and dry machining (without cutting fluid)). After cost estimation on total tool cost and cutting fluid cost (including purchase, handling, and disposal costs), the data in Table Q2 is obtained. You know that there are three (3) pillars/major aspects of sustainability, which are economy. society, and environment. From the data in Table Q2, recommend which type of machining condition to conduct the machining process. Justify your recommendation (10 marks) Machining condition. P Q R S T U V W X Table Q2: Costing estimate for machining 800 parts Cutting speed Cooling Tool cost (m/min) technique (RM) 100 dry 1750 100 MQL 1150 100 flood 800 200 200 200 300 300 300 dry MQL flood dry MQL flood 2000 1250 900 2250 1250 1000 Cutting fluid cost (RM) 0 150 600 0 100 450 0 50 300
Step by Step Solution
★★★★★
3.52 Rating (165 Votes )
There are 3 Steps involved in it
Step: 1
Question Machining Total Cost Condition P a ...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started