Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

A) Based on the information given on the table, analyse this office building, and to carry out the energy efficiency health audit assessments of the

A) Based on the information given on the table, analyse this office building, and to carry out the energy efficiency health audit assessments of the building. Appraise any FOUR (4) M&E systems in this building and give your comment on how the systems will affect the overall building energy efficiency.

B)Make a study on the operation status of chillers show in above case, examine and analyse the challenges in improving the existing chilled water-cooling plant performance efficiency.

c) Describe and propose FIVE (5) smart analytic techniques you would recommend analysing in buildings.

image text in transcribedimage text in transcribed
Sanitary & Plumbing System No. of Domestic Lvl-1: 47.2 CuM RC Tank (Lvl-1 Transfer Tank) Water Tanks: Lv1-6: 271 CuM FRP Tank (Serve B2 to Lv1-6 & Transfer Tank for Rooftop) Lvl-26: 47.2 CUM FRP Tank (Serve Lvl-8 to Lv1-25) No. of Toilets: Office Tower (Per Level) Shopping Mall (Total) 1 x Male Common Toilet 5 x Male Toilet 1 x Male Executive Toilet 5 x Female Toilet 1 x Female Common Toilet 5 x Handicapped Toilet 1 x Female Executive Toilet Table O1.6 - Sanitary and Plumbing System Lifts, Escalators & Travellators System Type of Lift System: Geared / Gearless Type of Mode Used: Without VVVF Motors Nos. of Lifts (Office Tower): 8 Nos. of Lifts (Shopping Mall): 6 Type of Escalators/Travellators System: Constant Speed Nos. of Escalators/Travellators: 30 Table Q1.7 - Lifts, Escalators & Travellators System Lighting System Office Tower / Shopping Mall: Lighting Type: PLC Car Park: Lighting Type: T5 Table 01.8 - Lighting System Building Waste Disposal Average Monthly General Waste 1 18,000 kg Disposed: Average Monthly Recyclable Waste 3,910 kg Collected: (Paper/Metal/Plastic) Table Q1.9 - Building Waste DisposalChiller Plant System Type of Centralised Air-Conditioning Water-Cooled System Nos. of Chiller Plants: 4nos. 550RT (Trane CVHG400) Nos. of Chilled Water Pumps: 4nos. 55kW (EBARA 150x125) Nos. of Condenser Water Pumps: 4nos. 55kW (EBARA 150x125) Nos. of Cooling Towers: Inos. 27.5kW (Kuken SKB-150R) Inos. 27.5kW (Kuken SKB-1600R-M) Average Peak Building Load (RT) 1,460RT Total Cooking Capacity (RT) 2.200RT System Efficiency 0.84 k W/RT Table 01.3 - Chiller Plant System ACMV System Nos. of AHUs: 30 AHU Model: Trane Quantum Climate Changer Air Handler (CLCP Euro 035) Nos. of FCUs: 238 Type of Air Distribution System: Constant Air Volume Table 01.4 - ACMV System Fire Protection System Type of Fire Alarm Addressable System System: Type of Fire Detection Fire Alarm System System Available: Smoke Detection System Type of Extinguishment Wet Riser System Smoke Curtain System System Available: Dry Riser System Hose Reel System Sprinkler System Fire Hydrant & Extinguishers Deluge System Table 01.5 - Fire Protection System

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Small Business Management Entrepreneurship and Beyond

Authors: Timothy s. Hatten

5th edition

538453141, 978-0538453141

More Books

Students also viewed these General Management questions