Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

A community hall is fitted with a large gas powered non-condensing boiler, housed in the basement, which supplies hot water for a kitchen, and heating

A community hall is fitted with a large gas powered non-condensing boiler, housed in the basement, which supplies hot water for a kitchen, and heating via a radiator system. The boiler is quite old, having been installed in 1976, efficiency being quite low. The building is used seven days a week, and typically for nine hours per day. The gas bill is currently high and a quote has been received to install a condensing boiler, with an increased efficiency. Assuming the heating and hot water requirements will not change, and based on the savings made in gas consumption, what is most basic estimate of the payback period for the new boiler (years)?

Current annual gas bill = 4000

Cost of new boiler = 6000 Existing boiler efficiency = 40% New boiler efficiency = 80%

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Thermal Energy Systems Design And Analysis

Authors: Steven G. Penoncello

2nd Edition

1138735892, 978-1138735897

More Books

Students also viewed these Mechanical Engineering questions