Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

a) For the existing layout, the cumulative noad distance or movement cost = feet (enter your response as a wholo number). Based on the flows

image text in transcribed
image text in transcribed
a) For the existing layout, the cumulative noad distance" or "movement cost" = feet (enter your response as a wholo number). Based on the flows shown in the matrix, one should expect thet the centers A and Wal be noxt to esch other as thay have the highest number of moves between each othef. Based on the flows shown in the matrix, one should expect that centers C and Will be naxt to each other as they have the second highest number of moves between each other. b) The aim is to improve the layout so that the lotal "movement cost" can be reduced. Functional locations for A and D have been fred. th the improved loyout, the werk center that should be located totween them is: The cumblatwe distance baved on the cvarall movement of parts between work censers for this layout = feet (enter pour responie as a whole number). figures below. a) For the existing layou, the cumulative "load distance" ox "movement cost" = feet (enter your reuponse at a whole number). Based on the forse shown in the matrix, one should expect enat the conters A and wal be next to each othar as they hava the Nighest number of mores between each other. Based on the flows shown in the matrix, one shoud expect that centers C and bo each other as shey have the second highest number of moves tetween each other b) The aim is to improve the layout so that the totas "movement cos?" can be reduct A located between them in: 30= c The cumulatre distance based on the overall movement of parts betheen work cel prout - leet (enter your response as a whole number)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Scheduling In Industry 4.0 And Cloud Manufacturing

Authors: Boris Sokolov, Dmitry Ivanov, Alexandre Dolgui

1st Edition

3030431762, 9783030431761

More Books

Students also viewed these General Management questions