Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

A manufacturer evaluates incoming power supplies from its vendor using the single sampling plan N = 5000, n = 25, and c = 0. In

A manufacturer evaluates incoming power supplies from its vendor using the single sampling plan N = 5000, n = 25, and c = 0. In Excel, or similar spreadsheet, construct and plot the OC curve using 11 points from 0% to 10% by 1% increments. The x-axis will be fraction defective (p or np0 depending on whether you use the Binomial or Poisson function). The y-axis will be Pa (probability of acceptance). On the same graph, construct and plot a second OC curve (N = 5000, n = 25, and c = 2) using the same x-axis values. Show your work.

a. What is the probability, under the c= 0 plan, of accepting a batch of power supplies that is 4% nonconforming?

b. What is the probability, under the c= 2 plan, of rejecting a batch of power supplies that is 4% nonconforming?

*Note: Excel portion is all done. I'm note sure on A. and B. parts though. Thank you

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Advanced Engineering Mathematics

Authors: ERWIN KREYSZIG

9th Edition

0471488852, 978-0471488859

More Books

Students also viewed these Mathematics questions

Question

Describe Balor method and give the chemical reaction.

Answered: 1 week ago

Question

How to prepare washing soda from common salt?

Answered: 1 week ago

Question

Explain strong and weak atoms with examples.

Answered: 1 week ago

Question

=+ a. The capitaloutput ratio is constant.

Answered: 1 week ago