A new power system has a peak load of 1000 MW (lasting 1200 hours/year) and an off-peak load of 400 MW (lasting 7560 hours/year). There
A new power system has a peak load of 1000 MW (lasting 1200 hours/year) and an off-peak load of 400 MW (lasting 7560 hours/year). There are no existing power plants. A single power utility will be building the new plants required for this system. Assume that it will build enough plants to meet demand plus a 12% reserve margin