A production process at Kenneth Day Manufacturing is shown in Figure S7.9. The drilling operation occurs separately from, and simultaneously with, the sawing and sanding
A production process at Kenneth Day Manufacturing
is shown in Figure S7.9. The drilling operation occurs separately
from, and simultaneously with, the sawing and sanding operations.
A product needs to go through only one of the three assembly
operations (the operations are in parallel).
a) Which operation is the bottleneck?
b) What is the bottleneck time?
c) What is the throughput time of the overall system?
d) If the firm operates 8 hours per day, 20 days per month, what
is the monthly capacity of the manufacturing process?
Sawing 6 units/hr
sanding 6 unity/hr
drilling 2.4 units/hr
all going into welding 2 unitys/hr
than from that goes
assembly 0.7 unity/hr
assembly 0.7 units/hr
assembly 0.7 unity/hr
so there are three assembly areas
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started