A signalized intersection has four (4) phases and a cycle length of 120 seconds. Assuming a lost time per phase equal to 3.2 seconds, and
A signalized intersection has four (4) phases and a cycle length of 120 seconds. Assuming a lost time per phase equal to 3.2 seconds, and a saturation discharge headway equal to two (2) seconds, is it possible to service 1600 vehicles per hour as the sum of critical lane volumes at this intersection? O Yes O No