Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

A slurry flowing at a rate of 8000 m3 /d is fed to a rectangular sedimentation tank to separate the sand particles (SG=2.65) from water

A slurry flowing at a rate of 8000 m3 /d is fed to a rectangular sedimentation tank to separate the sand particles (SG=2.65) from water (=1000 kg/m3 , =1 cP). The critical settling velocity was chosen to be that of a particle with a diameter of 0.02 mm. Calculate the minimum detention time required (in h) and the dimensions of the tank (in m). Assume that the depth is 3.5 m and the L:W is 3:1.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Introduction To Chemical Engineering Computing

Authors: Bruce A. Finlayson

2nd Edition

1118888316, 978-1118888315

More Books

Students also viewed these Chemical Engineering questions

Question

Explain basic guidelines for effective multicultural communication.

Answered: 1 week ago

Question

Identify communication barriers and describe ways to remove them.

Answered: 1 week ago

Question

Explain the communication process.

Answered: 1 week ago