Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

A small hydroelectric power plant was built to back up other sources of electricity that supplied the needs of a town that consumed 5,1100 kW.

image text in transcribed
A small hydroelectric power plant was built to back up other sources of electricity that supplied the needs of a town that consumed 5,1100 kW. One day, the plant that received power from the other sources suffered a breakdown and the city began to receive power only from power only from this small hydroelectric power plant. The reservoir of this plant contained 600,000 tons of water whose center of mass was 25 meters above the generator, the reference level. level. The generator had an efciency of 36% in transforming mechanical energy into electrical energy. Considering that the acceleration of gravity is 10 "\"52, for how long was this plant able to guarantee was able to guarantee the regular supply of this city? a) 3.0 h b) 2.0 h c) 4,0 h d) 2.5 h e) 3.5 h

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Contemporary College Physics

Authors: Edwin R Jones, Richard L Childers

3rd Edition

0072374810, 9780072374810

More Books

Students also viewed these Physics questions