A study was designed to examine the relationship between the TIME (in days) to complete a construction project. Data were collected on 15 projects and
A study was designed to examine the relationship between the TIME (in days) to complete a construction project. Data were collected on 15 projects and included the following independent variables: SIZE of the contract ($1,000s); BAD DAYS, number of bad weather days; STRIKE, a dummy variable whether or not there was a strike 1= strike, 0 = no strike; SUBCONTRACT, the number of sub-contractors involved. The correlation matrix is given below.
Time | Size | Bad Days | Strike | Subcontact | |
Time | 1.000 | ||||
Size | 0.450 | 1.000 | |||
Bad Days | 0.695 | 0.566 | 1.000 | ||
Strike | 0.877 | 0.538 | 0.666 | 1.000 | |
Subcontact | 0.844 | 0.662 | 0.728 | 0.814 | 1.000 |
What is the correlation between STRIKE and SUBCONTRACT
A. .814 |
B..877 |
C..728 |
D. 1.000 |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started