A toy manufacturer uses 49,560 rubber wheels per year for its popular dump truck series. The firm makes its own wheels, which it can produce

A toy manufacturer uses 49,560 rubber wheels per year for its popular dump truck series. The firm makes its own wheels, which it can produce at a rate of 700 per day. The toy trucks are assembled uniformly over the entire year. Carrying cost is $1.70 per wheel per year. Setup cost for a production run is $42. The firm operates 236 days per year. Determine the following:

image text in transcribed
A toy manufocturer uses 49,560 rubber wheels per year for its popular dump truck series. The firm makes its own wheels, which it can produce at a rate of 700 per day. The toy trucks are assembled uniformly over the entire yeac Carfying cost is $170 per wheel per year. Setup cost for a production run is $42. The firm operates 236 days per yea. Determine the following: a. Optimal run size (Round your answer to a whole number, following normal rules of rounding.) b. Use your final answer from part a to determine minimum total annual cost for corrying and setup. (Round your answer to a whole number.) c. Cycle time for the optimal run size (hound your answer to two decimal points.) d. Pun time (Pound your answer to two decimal points.) A toy manufocturer uses 49,560 rubber wheels per year for its popular dump truck series. The firm makes its own wheels, which it can produce at a rate of 700 per day. The toy trucks are assembled uniformly over the entire yeac Carfying cost is $170 per wheel per year. Setup cost for a production run is $42. The firm operates 236 days per yea. Determine the following: a. Optimal run size (Round your answer to a whole number, following normal rules of rounding.) b. Use your final answer from part a to determine minimum total annual cost for corrying and setup. (Round your answer to a whole number.) c. Cycle time for the optimal run size (hound your answer to two decimal points.) d. Pun time (Pound your answer to two decimal points.)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Business Research Methods

Authors: Emma Bell, Bill Harley, Alan Bryman

5th Edition

0198809875, 9780198809876

More Books

Students also viewed these General Management questions