A water district needs an additional supply of water from a local reservoir. The engineer has selected two plans for comparison: (a) The Gravity plan,

A water district needs an additional supply of water from a local reservoir. The engineer has selected two plans for comparison: (a) The Gravity plan, where water is diverted at a point 15 miles up-river from the reservoir and carried to the water district by gravity through the pipeline; or (2) the Pumping plan, where water is diverted at a point nearer the district and pumped through three miles of pipeline. The pumping station can be built in two stages, part now and part twenty years later. Use a 50-year analysis period and 6% interest. Salvage values can be ignored. Use the conventional incremental benefit-cost ratio method to select the more economical plan.

Gravity

Pumping

Initial investment

$ 3,000,000

$ 1,500,000

Investment in 20th year

0

$ 500,000

Annual M&O

$ 15,000

$ 25,000

Average annual power cost

First 20 years

0

$ 75,000

Next 30 years

0

$ 150,000

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Bitcoins Investment

Authors: Paulita Kingrey

1st Edition

979-8353894094

More Books

Students also viewed these Finance questions

Question

List out some inventory management techniques.

Answered: 1 week ago