Question
ABC uses these two basic components : the metal frame and the fabric to manufacture their umbrellas. The standard cost card for the sewing and
ABC uses these two basic components : the metal frame and the fabric to manufacture their umbrellas. The standard cost card for the sewing and assembly of each umbrella is as follows:
Budgeted data | Quantity | Cost | Total cost |
Frame (each) | 1 | $12.00 | $12.00 |
Fabric (metres) | 2.25 | $14.00 | $31.50 |
Labour (hours) | 3 | $15.00 | $45.00 |
Variable overhead (machine hours) | 4 | $2.00 | $8.00 |
|
|
| $96.50 |
During May, actual production was 90 umbrellas. Normal production volume is 100 umbrellas. Additional actual data on the use of inputs for the month is as follows:
Materials Purchases
100 frames at $14.00 each
225 metres of fabric at $13.80 per metre
Issued to production
94 frames and 192 metres of fabric
Labour
Labour hours | Rate per hour | Total |
100 | $14 | $1,400 |
200 | $16 | $3,200 |
Actual machine hours used was 400 hours and variable overhead incurred was $800.
What is the combined direct materials purchase price variance for frames and fabric?
Group of answer choices
$140 U
$245 U
$155 U
$150 U
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started