Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

(a) Identify the bottleneck activity on this operation process chart. (b) What is the cycle time for the bottleneck activity? 10 30 Upper lid part

Upper lid part 10 10 10 Spout Cut tube 0.210 min 10 Base Punch and draw 0.210 min 10 Lid lever Molding process 1.200 min Cutt 


(a) Identify the bottleneck activity on this operation process chart.

(b) What is the cycle time for the bottleneck activity?

10 30 Upper lid part 40 Molding process 1.200 min 20) section Cutting the 1.320 min Drill hole 1.530 min Inspection 1.650 min 10 30 Lid lever Molding process 1.200 min Cutting the section 1.320 min Inspection 1.440 min Roll pin 10 20 30 40 50 SA1) Handle Molding process 1.200 min Cutting the section. 1.320 min Drill hole 1.530 min Drill nut hole 1.770 min Inspection 1.890 min Assemble three parts 4.250 min Spout Cut tube 0.210 min 10 Base Punch and draw 0.210 min Inspection 0.312 min 10 20 Body Punch out 0.210 min Deep draw 0.420 min Inspection 0.502 min Screws 10 20 30 A1 A2 A3 A4 A5 40 Welding body to base 2.550 min Welding spout to body 4.510 min Sand off excess weld 6.750 min Buffing for finishing 8.450 min Screw handle to body 10.520 min Inspection 10.622 min

Step by Step Solution

3.34 Rating (163 Votes )

There are 3 Steps involved in it

Step: 1

a Identify the bottleneck activity on ... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Vector Mechanics for Engineers Statics and Dynamics

Authors: Ferdinand Beer, E. Russell Johnston, Jr., Elliot Eisenberg, William Clausen, David Mazurek, Phillip Cornwell

8th Edition

73212229, 978-0073212227

More Books

Students also viewed these Accounting questions

Question

What is the cycle time in a manufacturing operation?

Answered: 1 week ago

Question

=+b) Would the consultants information be useful? Explain.

Answered: 1 week ago